Preparation a Second Story Addition

Posted on: December 13, 2022 by in Uncategorized
No Comments

Preparation a Second Story Addition

When handling a task that consists of removing your roof, Planning is the trick.
Prior to you prepare your 2nd story, research study what barriers will need to be dealt with. Examples of items that need to be solved are:
– Size of ceiling joists, can they support a 2nd story floor covering?
– Are mechanicals run over the top of existing ceiling joists? (pipelines, electRic, HVAC).
– How much overhang is on existing roof and exist any energies protected to it.
– Is the existing roof stick built( built on site) or a truss roof( made).
– Is the roof sheathing 1x boards or plywood?
– How great deals of layers of shingles exist?
– Are there any Stacks or flues extending through the roof such as a fireplace chimney, heater flue, or vent pipeline.
These things need to be considered so the addition can be established as quickly as possible.
When starting the tearoff, the really first thing that needs to be addressedis the soffit. When it comes time to remove them, removing this at first will launch up the rafter ends.
Now you can tearoff the roof. The most hassle-free approach to eliminate the shingles and sheathing is with a circular saw. Due to the truth that it will be trash when you are done, it’s finest to use an old blade with a lower amount off teeth.
When cutting the roof away, start at the ridgeboard and run the saw in between the rafters all the approach to the rafter tails. Repeat this cut every 32″ from one end of the roof to the other. These pieces, presuming they are plywood, can be removed in 32″ x 48″ squares.
If the roof sheathing is pieces, the cuts should be made 48″ to 64″ apart. If there are 2 or mre layers of shingles, you require to be able to roll these locations down the rafters.
As quickly as the roof sheathing is eliminated, the remainder of the components canbe gotten rid of. As quickly as that is gone the rafters can be removed.
After the sheathing is eliminated, much of the truss work will need to be eliminated. The only part left would be the bottom cable television that holds up the drywall ceiling. Each scenario is numerous and what is used is spect by an engineer or designer.
The electrical (opportunity), pipelines and/or HVAC run over the top of the ceiling joists. Usually, the most basic approach to handle this, is to build a knee wall high enough for the new floor covering joists to clear these obstructions.
When the deck is down, the walls, ceiling joists, and roof of your new addition can follow.
Whatever situation might you have, terrific preparation will make this taskeasier and quicker. Time is of the essence when it comes to getting rid of a roof. You want to protect the existing structure and all of your crucial possesions that are left within.
( c) 2005 Mike Merisko www.sawkerfs.com.

Removing this at first will launch up the rafter ends when it comes time to remove them. Time is of the essence when it comes to removing a roof.

When it comes to getting rid of a roof, Time is of the essence. Removing this at first will launch up the rafter ends when it comes time to remove them. The most hassle-free approach to remove the shingles and sheathing is with a circular saw. When that is gone the rafters can be removed. Time is of the essence when it comes to removing a roof.

Comments are closed.